Close Menu
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
What's Hot

$599 MacBook Neo for Students: Specs, Tradeoffs, and Best Uses

March 8, 2026

Funniest Cats and Dogs Clips 2026😼🐶Try Not To Laugh😜 Part 1

March 8, 2026

🔴 24/7 LIVE CAT TV NO ADS😺 Awesome Red Squirrels and Adorable Little Birds Forest Nut Party for All

March 8, 2026
Facebook X (Twitter) Instagram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
Facebook X (Twitter) Instagram
KittyBNK
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
KittyBNK
Home » NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission
Tech News

NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission

October 25, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission
Share
Facebook Twitter LinkedIn Pinterest Email

NASA spent the last two weeks hoisting a 103-ton component onto a simulator and installing it to help prepare for the next Moon missions. Crews fitted the interstage simulator component onto the Thad Cochran Test Stand at Stennis Space Center near Bay St. Louis, Mississippi. The connecting section mimics the same SLS (Space Launch System) part that will help protect the rocket’s upper stage, which will propel the Orion spacecraft on its planned Artemis launches.

The Thad Cochran Test Stand is where NASA sets up the SLS components and conducts thorough testing to ensure they’ll be safe and operating as intended on the versions that fly into space. The new section was installed onto the B-2 position of the testing center and is now fitted with all the necessary piping, tubing and electrical systems for future test runs.

NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission

NASA

The interstage section will protect electrical and propulsion systems and support the SLS’s EUS (Exploration Upper Stage) in the rocket’s latest design iteration, Block 1B. It will replace the current Block 1 version and offer a 40 percent bigger payload. The EUS will support 38 tons of cargo with a crew or 42 tons without a crew, compared to 27 tons of crew and cargo in the Block 1 iteration. (Progress!) Four RL10 engines, made by contractor L3Harris, will power the new EUS.

The interstage simulator section NASA spent mid-October installing weighs 103 tons and measures 31 feet in diameter and 33 feet tall. The section’s top portion will absorb the EUS hot fire thrust, transferring it back to the test stand so the test stand doesn’t collapse under the four engines’ more than 97,000 pounds of thrust.

1 / 14

NASA installs the interstage simulator section

Various photos of NASA lifting and installing the SLS interstage simulator section at the Stennis Space Center.

NASA’s testing at Stennis Space Center will prepare the SLS for the Artemis IV mission, which will send four astronauts aboard the Orion spacecraft to the Lunar Gateway space station to install a new module. After that, they’ll descend to the Moon’s surface in the Starship HLS (Human Landing System) lunar lander.

You can catch some glimpses into NASA’s heavy lifting in the video below:

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Galaxy S26 Ultra, Galaxy Buds 4, Dell XPS 14 and more

March 7, 2026

Samsung Galaxy Buds 4 and 4 Pro review: Impressive audio, imperfect ANC

March 6, 2026

Possibly the most charming Pokémon game yet

March 6, 2026

A beautiful laptop that excels at almost everything… except typing

March 6, 2026
Add A Comment
Leave A Reply Cancel Reply

What's New Here!

बिल्ली और कबूतर 3 | Cat And Pigeon | Chintu cartoon | pagal beta | desi comedy video| cs bisht vines

September 26, 2025

iPhone 20th Anniversary: The Radical Redesign Revealed

June 21, 2025

Nothing’s budget-friendly brand CMF debuts a $69 smartwatch and $49 earbuds

September 27, 2023

Man finds half a Ferrari sat in garage

June 28, 2024

Cats with a few Brain Cells

June 17, 2024
Facebook X (Twitter) Instagram Telegram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2026 kittybnk.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.