Close Menu
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
What's Hot

Kidnaped 😹😹 #cat #catvideos #pets #shorts #viralcats #catlife #youtubeshorts #growth #funny #cats

June 24, 2026

Lumysi Hid An Activity Tracker In A Bracelet Because Wearables Are Gauche, Darling

June 24, 2026

Bitcoin Price at $60K: Is This a Dead Cat Bounce Before the Next Breakdown?

June 24, 2026
Facebook X (Twitter) Instagram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
Facebook X (Twitter) Instagram
KittyBNK
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
KittyBNK
Home » NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission
Tech News

NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission

October 25, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission
Share
Facebook Twitter LinkedIn Pinterest Email

NASA spent the last two weeks hoisting a 103-ton component onto a simulator and installing it to help prepare for the next Moon missions. Crews fitted the interstage simulator component onto the Thad Cochran Test Stand at Stennis Space Center near Bay St. Louis, Mississippi. The connecting section mimics the same SLS (Space Launch System) part that will help protect the rocket’s upper stage, which will propel the Orion spacecraft on its planned Artemis launches.

The Thad Cochran Test Stand is where NASA sets up the SLS components and conducts thorough testing to ensure they’ll be safe and operating as intended on the versions that fly into space. The new section was installed onto the B-2 position of the testing center and is now fitted with all the necessary piping, tubing and electrical systems for future test runs.

NASA spent October hoisting a 103-ton simulator section onto a test stand to prep for the next Moon mission

NASA

The interstage section will protect electrical and propulsion systems and support the SLS’s EUS (Exploration Upper Stage) in the rocket’s latest design iteration, Block 1B. It will replace the current Block 1 version and offer a 40 percent bigger payload. The EUS will support 38 tons of cargo with a crew or 42 tons without a crew, compared to 27 tons of crew and cargo in the Block 1 iteration. (Progress!) Four RL10 engines, made by contractor L3Harris, will power the new EUS.

The interstage simulator section NASA spent mid-October installing weighs 103 tons and measures 31 feet in diameter and 33 feet tall. The section’s top portion will absorb the EUS hot fire thrust, transferring it back to the test stand so the test stand doesn’t collapse under the four engines’ more than 97,000 pounds of thrust.

1 / 14

NASA installs the interstage simulator section

Various photos of NASA lifting and installing the SLS interstage simulator section at the Stennis Space Center.

NASA’s testing at Stennis Space Center will prepare the SLS for the Artemis IV mission, which will send four astronauts aboard the Orion spacecraft to the Lunar Gateway space station to install a new module. After that, they’ll descend to the Moon’s surface in the Starship HLS (Human Landing System) lunar lander.

You can catch some glimpses into NASA’s heavy lifting in the video below:

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Lumysi Hid An Activity Tracker In A Bracelet Because Wearables Are Gauche, Darling

June 24, 2026

Google Says It’ll Soon Be Easier To Use TSA PreCheck Touchless ID Via Wallet

June 24, 2026

Rockstar Finally Reveals Pricing For Grand Theft Auto 6

June 24, 2026

YouTube Settles Early Test Case Over Social Media Harm To Children

June 24, 2026
Add A Comment
Leave A Reply Cancel Reply

What's New Here!

Apple’s upgraded 2nd-gen AirPods Pro with USB-C are $50 off right now

October 29, 2023

Binance to release 15K USDT for new users of “Buy Crypto” scheme

June 5, 2024

Ethereum Weekly Chart Tightens Near Resistance—Is a Major Move Coming for ETH Price?

January 8, 2026

Lenovo ThinkPad P1 Gen 7 Mobile Workstation 2024

April 26, 2024

Samsung Galaxy S26 Ultra: Everything You Need to Know

September 8, 2025
Facebook X (Twitter) Instagram Telegram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2026 kittybnk.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.