Close Menu
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
What's Hot

COIN Price Gains Bullish Momentum

May 12, 2025

Ai animated Cat funny video #pets #funny #wildlife

May 12, 2025

Samsung may finally give the Galaxy Z Flip a larger cover screen

May 12, 2025
Facebook X (Twitter) Instagram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
Facebook X (Twitter) Instagram
KittyBNK
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
KittyBNK
Home » First Premier gold pour stays on schedule
Gold News

First Premier gold pour stays on schedule

March 28, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
First Premier gold pour stays on schedule
Share
Facebook Twitter LinkedIn Pinterest Email

Ascot Resources Ltd. March 26 reported that it remains on track for the first gold pour at Premier in April and will reach commercial production at the new iteration of this historic gold-silver mine sometime after midyear.

Lying about 15 kilometers (nine miles) north of Stewart, B.C., Ascot’s Premier project is home to a past-producing gold mine that last operated in the 1990s.

Infrastructure from the previous mine provided Ascot with a framework to build its new gold operation on the historic property.

A feasibility study completed in 2020 detailed plans to develop four underground mines – Big Missouri, Premier, Silver Coin, and Red Mountain – that will feed ore to the upgraded mill at Premier. At 2,500 metric tons per day, this operation is expected to produce roughly 1.1 million ounces of gold and 3 million oz of silver over the first eight years of mining.

This new era of Premier mining is based on 3.63 million metric tons of probable reserves averaging 5.45 grams per metric ton (637,000 oz) gold and 19.1 g/t (2.23 million oz) silver within the Silver Coin, Big Missouri, and Premier deposits; plus 2.55 million metric tons of proven and probable reserves averaging 6.52 g/t (534,000 oz) gold and 20.6 g/t (1.69 million oz) silver at Red Mountain, which is on a separate property about 20 kilometers (12 miles) to the southeast.

As of the end of February, the development of the mine outlined in the feasibility study was 94% complete, and Ascot anticipates introducing the first ore into the mill over the next couple of days.

The initial ore processed at Premier is being delivered from Big Missouri, a deposit about 3.7 miles (six kilometers) north of the Premier mill that hosts 809,000 metric tons of the overall probable reserves averaging 7.15 g/t (186,000 oz) gold and 12.2 g/t (317,000 oz) silver.

As of March 21, approximately 2,091 meters of underground development have been completed at Big Missouri, and ore from this deposit has been stockpiled at the mill in preparation for commissioning and operations.

In late 2023, underground decline development began on the new Premier Portal close to the mill. Mining development is being advanced down into the Premier deposit for initial mining in the Prew Zone, with ore development anticipated to begin during the second quarter and stoping to begin after midyear. As of March 15, roughly 32 meters of underground development had been completed at Premier.

With a C$96.6 million financing package that closed on Feb. 20, Ascot believes that it has sufficient funding to complete construction and ramp up commercial production at Premier over the coming months.

In the meantime, the company should begin seeing the first ounces of gold supplementing its treasury beginning in April.

Author Bio

Shane Lasley, Publisher

Over his more than 16 years of covering mining and mineral exploration, Shane has become renowned for his ability to report on the sector in a way that is technically sound enough to inform industry insiders while being easy to understand by a wider audience.

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

4 gold investing moves beginners should make with the price high

July 30, 2024

Fortitude Gold Drills 9.14 Meters Grading 2.33 g/t Gold Within 16.76 Meters Grading 1.58 g/t Gold at Scarlet North

July 30, 2024

First Majestic Announces New High-Grade Gold and Silver Discovery at Santa Elena

July 30, 2024

Those who invested in Serabi Gold (LON:SRB) a year ago are up 163%

July 30, 2024
Add A Comment
Leave A Reply Cancel Reply

What's New Here!

Good as gold – improving infectious disease t

April 6, 2024

Flipper and Raspberry Pi create new game module for Flipper Zero

February 13, 2024

Sui (SUI) Price Analysis Today: Key Targets to Consider Ahead

April 24, 2025

One of our favorite cordless vacuums is $175 off at Amazon

June 26, 2024

Explore 699+ Best Residential Property In Gurugram – Luxury Property In India

April 29, 2024
Facebook X (Twitter) Instagram Telegram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2025 kittybnk.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.