Close Menu
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
What's Hot

🌞🐱 Happy Kittens Enjoying Outdoor Adventures | Cute Cat Videos | Cat Sounds

August 3, 2026

Apple Watch Ultra 4 Rumors: Slimmer Design and Health Tech

August 3, 2026

Zcash Price Holds Key Trendline Support—Can ZEC Reclaim $550 Next?

August 3, 2026
Facebook X (Twitter) Instagram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
Facebook X (Twitter) Instagram
KittyBNK
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
KittyBNK
Home » Google Bought All Of A Major Solar Farm’s Output To Offset Its Dirty Data Center Emissions
Tech News

Google Bought All Of A Major Solar Farm’s Output To Offset Its Dirty Data Center Emissions

July 14, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Google Bought All Of A Major Solar Farm’s Output To Offset Its Dirty Data Center Emissions
Share
Facebook Twitter LinkedIn Pinterest Email

The massive project will output 1.6GW of solar power upon startup, enough to power 315,000 homes.



Ron Jenkins/Getty Images

Google has struck a deal to purchase a major solar project’s entire electrical output to offset its fossil fuel emissions, The Financial Times reports. The search giant will take 100 percent of the initial output from Steel River Energy Center in Arkansas once it comes online in 2029, amounting to 1.6 gigawatts (GW) of solar power and 2GW of battery storage — enough to power 315,000 homes. 

Google will pay a fixed cost for the electricity from the solar plant, but won’t use it directly. Instead, it will draw from the grid powered by a mix of coal, nuclear, renewables and natural gas, along with its own on-site power (typically gas turbines and engines). 

Energy from the Steel River Energy Center solar project will form part of that grid mix. Once completed, the project will supply 2.45GW of solar power and 2.9GWh of battery energy storage. The first two phases (out of three) received $3.5 billion in financing and prioritized US-manufactured steel and solar panels. 

Google’s electricity use rose 37 percent last year, which pushed up its grid-based emissions by the same amount. Other tech giants like Meta and Amazon also saw massive leaps in energy consumption due to data centers powering AI. Much of that has been powered fossil fuel sources that have further pushed up CO2 emissions in a rapidly warming planet. The recent heat waves across Europe would have been “virtually impossible” without climate change, scientists said last month.

Tech giants have looked at clean energy projects to offset that fossil fuel power, a controversial practice that some experts say isn’t effective. Meta recently purchased the entire electricty output (200MW) of another solar plant in Texas, while Amazon recently agreed to buy out the troubled 1.2GW Sunstone solar and battery project in Oregon. 

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

MacBook Air Laptops Are Reportedly In Short Supply Due To Ramaggedon

August 3, 2026

Xbox Consoles Are Now Much More Expensive In The EU And UK

August 2, 2026

How Long Can You Expect A PlayStation 5 To Last?

August 2, 2026

Here’s Where You Want To Be To See The 2026 Solar Eclipse

August 2, 2026
Add A Comment
Leave A Reply Cancel Reply

What's New Here!

My Cat’s Only Got 3 Modes 🤣 #cat #cats #catvideos #catfails

September 12, 2025

Solana Price Nears $130 Breakout: Will SIMD-228 Demand Push It to $145?

March 12, 2025

XRP Flips Resistance to Support, Eyes $4 and $8 Surge

January 13, 2025

iOS 17.5 vs iOS 17.5.1 (Video)

May 22, 2024

How Marni Designer Francesco Risso Built the Ultimate Fashion Playground

April 9, 2024
Facebook X (Twitter) Instagram Telegram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2026 kittybnk.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.