Close Menu
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
What's Hot

SpaceX’s First Public Earnings Statement Shows The Financials Of An AI Company In 2026

August 4, 2026

Kittens Are The CUTEST in the World 🤣

August 4, 2026

Sam Bankman-Fried Appeal Rejected: What Are His Next Legal Options

August 4, 2026
Facebook X (Twitter) Instagram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
Facebook X (Twitter) Instagram
KittyBNK
  • Home
  • Crypto News
  • Tech News
  • Gadgets
  • NFT’s
  • Luxury Goods
  • Gold News
  • Cat Videos
KittyBNK
Home » Microsoft’s upcoming custom chip will be made by Intel
Tech News

Microsoft’s upcoming custom chip will be made by Intel

February 22, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Microsoft’s upcoming custom chip will be made by Intel
Share
Facebook Twitter LinkedIn Pinterest Email

Intel’s relatively new Foundry division — formerly known as Intel Foundry Services until earlier today — has just landed a notable order from a big name. According to Bloomberg and The Wall Street Journal, Microsoft CEO Satya Nadella announced that his company will be tapping into Intel’s latest 18A (1.8nm) fabrication process for an upcoming in-house chip design. But given Intel’s process roadmap, this means we likely won’t be seeing Microsoft’s new chip until 2025.

While neither company disclosed the nature of said silicon, Microsoft did unveil its custom-made Azure Maia AI Accelerator and Azure Cobalt 100 CPU server chips last November, with an expected rollout some time “early” this year to bolster its own AI services. The Cobalt 100 is based on Arm architecture, and it just so happens that Intel has been optimizing its 18A process for Arm designs since April last year (it even became an Arm investor later), so there’s a good chance that this collaboration may lead to the next-gen Cobalt CPU.

In addition to the usual efficiency improvements as node size decreases, Intel 18A also offers “the industry’s first backside power solution” which, according to IEEE’s Spectrum, separates the power interconnect layer from the data interconnect layer at the top, and moves the former to beneath the silicon substrate — as implied by the name. This apparently allows for improved voltage regulation and lower resistance, which in turn enable faster logic and lower power consumption, especially when applied to 3D stacking.

Intel

In Intel’s Q4 earnings call, CEO Pat Gelsinger confirmed that “18A is expected to achieve manufacturing readiness in second half ’24.” Given that Intel’s very own 18A-based processors — “Clearwater Forest” for servers and “Panther Lake” for clients — won’t arrive until 2025, chances are it’ll be a similar time frame for Microsoft’s next chip.

At Intel’s event earlier today, the exec shared an extended Intel Foundry process technology roadmap, which features a new 14A (1.4nm) node enabled by ASML’s “High-NA EUV” (high-numerical aperture extreme ultraviolet) lithography system. According to AnandTech, this 14A leap may help Intel play catchup after its late EUV adoption for its Intel 4 (7nm) node, though risk production won’t take place until the end of 2026.

Intel Foundry is the brainchild of Gelsinger, who launched this department right after he assumed the CEO role in February 2021, as part of his ambitious plan to put Intel up against the likes of TSMC and Samsung in the contract chip-making market. Before Microsoft, Intel Foundry’s list of clients already include MediaTek, Qualcomm and Amazon. The company still aims to become “the second largest external foundry by 2030” in terms of manufacturing revenue, which it believes is achievable as early as this year.

This article contains affiliate links; if you click such a link and make a purchase, we may earn a commission.

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

SpaceX’s First Public Earnings Statement Shows The Financials Of An AI Company In 2026

August 4, 2026

NJ Antitrust Suit Accuses Amazon Of Unlawfully Wielding Power Over Delivery Contractors

August 4, 2026

exFAT Vs NTFS: What’s The Difference Between These Formats?

August 4, 2026

Here’s How To Watch The Nintendo Direct For Fire Emblem: Fortune’s Weave

August 4, 2026
Add A Comment
Leave A Reply Cancel Reply

What's New Here!

Dallas Luxury Real Estate – Most Expensive Mansions in DFW Now

February 20, 2024

Can BTC Follow Gold’s Rally to New Highs?

March 18, 2025

First delivery of 2024 for Damen Yachting

January 22, 2024

Gold prices and rate cut expectations rise after Fed’s Waller says he sees inflation falling in Q4

November 28, 2023

The Vivo X300 Ultra is a powerful camera phone aimed at videographers

April 15, 2026
Facebook X (Twitter) Instagram Telegram
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2026 kittybnk.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.